Control Level Schedule (Level 3 Schedule)

A Control Level Schedule (Level 3 Schedule or Network Schedule) is an actual project schedule control and management tool for a work level. The Project Control Level Schedule is integrated detailed EPC activities for the entire project scope of work based on a Critical Path Method (CPM) used a network scheduling technology with detailed input all major milestones, major elements of design engineering, procurement, construction, pre-commissioning, and commissioning activities. The Project Control Level Schedule shows detail and individual work tasks and clearly defined works by discipline or responsibility. This is a first level of detailed schedule that a meaningful critical path management can be performed to monitor and manage the overall project work accurately, and usually basis of a look ahead or window schedules for the project schedule control and management. 

Related Definitions in the Project: The Project Schedule; Project Management

Posted in Controls, Management and tagged , , , , .

ThePD (The Project Definition)

ThePD has been developing the Preferred Project Definitions based on the actual project execution and operation experiences and knowledge with the Project Language, and sharing with you daily basis.