IFC (Indirect Field Cost) refers to the Indirect Field Cost (IFC). (Refer to the Direct Field Cost (DFC))
Related Cost in the Project: The Project Cost
IFC (Indirect Field Cost) refers to the Indirect Field Cost (IFC). (Refer to the Direct Field Cost (DFC))
Related Cost in the Project: The Project Cost