Peak Load (or Demand)

Peak Load (or Demand) is the maximum demand (energy, etc.) or load produced or consumed by a unit or system in a specified time period, typically characterised as annual, daily or seasonal. (Refer to the Load Management)

Related Definitions in the Project: The Engineering; Project Management; Energy Definitions

Posted in Engineering, Management and tagged , , , , .

ThePD (The Project Definition)

ThePD has been developing the Preferred Project Definitions based on the actual project execution and operation experiences and knowledge with the Project Language, and sharing with you daily basis.